Projects

Fabrication of Tong Hanging Frame

Our Dubai workshop completed a contract for Frank’s International to fabricate and supply tong hanging frame, which will finally be used on a rig currently operating in the Caspian Sea. Specific tasks included fabrication and supply of lifting bracket, carrying out of MPI weld joints, external abrasive “near-white metal blast” blasting and painting, assembly of hydraulic components to the frame, load testing according to the procedure provided by the client, hose fittings, scaffolding and many more related jobs. 

The project also involved initial and final tests to ensure safety and high-quality standards are met. The frame was tested first at our works and later onboard the rig and was accepted by the Customer. Franks is very happy with their first experience and is keen to employ our workshop for upcoming projects.