Main Deck Reinstating For MV Finesse

Dockwise vessel MV FINESSE shipped a module from China to Iraq and after offloading the cargo, the vessel’s main deck had to be reinstated to original condition. This required removal of all grillages, railings, machinery which had been installed on the main deck for securing and lashing the module during transportation. The reinstatement contract included removal of 1,700 metric tons of steel structures, machinery and equipment and upon completion all heat affected areas required preparation and painting to bring the decks and tank internals back to original condition.

The entire project was successfully executed by our Abu Dhabi operations in full compliance with stringent Port Khalifa HSE regulations and within the allotted time span of 20 days.